Wolf Creek - Blackberry 345 kV Line (GEN-2024-139)

Wolf Creek - Blackberry 345 kV Line is a 250.0 MW solar interconnection project in Coffey, Kansas with a current status of withdrawn. It is proposed to connect at Wolf Creek - Blackberry 345 kV Line.

250.0 MWCapacity
WithdrawnStatus
KSMarket
SolarTechnology

Project facts

Canonical nameWolf Creek - Blackberry 345 kV Line
Queue IDGEN-2024-139
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologySolar
Capacity250.0 MW
StateKansas
CountyCoffey
Point of interconnectionWolf Creek - Blackberry 345 kV Line
Requested (queue) date2025-03-01
Proposed in-service date2033-12-31
Operational date
Withdrawn date2026-08-10
Developer
Utility / transmission ownerNEETSW

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-12statusoperationalwithdrawnhigh
2026-08-12withdrawn_date2026-08-10high
2026-08-12proposed_online_date2033-12-31medium
2026-08-12operational_date2033-10-03medium
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata