Wolf Hollow 2 (17INR0009)

Wolf Hollow 2 is a 1,118.0 MW gas interconnection project with a current status of operational. It is proposed to connect at 151081-3 WHCCS2 25kV & 23.5kV.

1,118.0 MWCapacity
OperationalStatus
ERCOTMarket
GasTechnology

Project facts

Canonical nameWolf Hollow 2
Queue ID17INR0009
Statusoperational
Source statusoperational
MarketERCOT
TechnologyGas
Capacity1,118.0 MW
State
County
Point of interconnection151081-3 WHCCS2 25kV & 23.5kV
Requested (queue) date2014-01-31
Proposed in-service date2017-05-01
Operational date2017-05-02
Withdrawn date
DeveloperExelon Wind, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.