Wolf Hollow I LP (55139_CTG1)

Wolf Hollow I LP is a 243.9 MW gas interconnection project in Hood, Texas with a current status of operational.

243.9 MWCapacity
OperationalStatus
ERCOMarket
GasTechnology

Project facts

Canonical nameWolf Hollow I LP
Queue ID55139_CTG1
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyGas
Capacity243.9 MW
StateTexas
CountyHood
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2003-08-01
Withdrawn date
Developer
Utility / transmission ownerWolf Hollow I Power, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.