Wolf Hollow III (24INR0567)

Wolf Hollow III is a 306.3 MW gas interconnection project in Hood, Texas with a current status of operational. It is proposed to connect at 1877 Mitchell Bend 345KV.

306.3 MWCapacity
OperationalStatus
HoodMarket
GasTechnology

Project facts

Canonical nameWolf Hollow III
Queue ID24INR0567
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketHood
TechnologyGas
Capacity306.3 MW
StateTexas
CountyHood
Point of interconnection1877 Mitchell Bend 345KV
Requested (queue) date2023-06-07
Proposed in-service date
Operational date2027-05-31
Withdrawn date
DeveloperWolf Hollow II Power LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.