Wolf Ridge Wind (58080_1)

Wolf Ridge Wind is a 112.5 MW wind interconnection project in Cooke, Texas with a current status of operational.

112.5 MWCapacity
OperationalStatus
ERCOMarket
WindTechnology

Project facts

Canonical nameWolf Ridge Wind
Queue ID58080_1
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyWind
Capacity112.5 MW
StateTexas
CountyCooke
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2008-08-01
Withdrawn date
Developer
Utility / transmission ownerNextera

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.