Woodland Solar Farm (60318_1)

Woodland Solar Farm is a 19.0 MW solar interconnection project in Isle Of Wight, Virginia with a current status of operational.

19.0 MWCapacity
OperationalStatus
PJMMarket
SolarTechnology

Project facts

Canonical nameWoodland Solar Farm
Queue ID60318_1
Statusoperational
Source status(OP) Operating
MarketPJM
TechnologySolar
Capacity19.0 MW
StateVirginia
CountyIsle Of Wight
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2016-12-01
Withdrawn date—
Developer—
Utility / transmission ownerVirginia Electric & Power Co

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.