Woodward Mountain I (55796_01)

Woodward Mountain I is a 82.0 MW wind interconnection project in Pecos, Texas with a current status of operational.

82.0 MWCapacity
OperationalStatus
ERCOMarket
WindTechnology

Project facts

Canonical nameWoodward Mountain I
Queue ID55796_01
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyWind
Capacity82.0 MW
StateTexas
CountyPecos
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2001-07-01
Withdrawn date—
Developer—
Utility / transmission ownerPecos Wind II LP

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata