Worthington - Merom 345kV Line (J3000)

Worthington - Merom 345kV Line is a 80.0 MW battery interconnection project in Greene, Indiana with a current status of withdrawn. It is proposed to connect at Worthington - Merom 345kV Line.

80.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameWorthington - Merom 345kV Line
Queue IDJ3000
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity80.0 MW
StateIndiana
CountyGreene
Point of interconnectionWorthington - Merom 345kV Line
Requested (queue) date2022-09-14
Proposed in-service date2025-09-15
Operational date2025-09-15
Withdrawn date2025-10-27
Developer
Utility / transmission ownerHoosier Energy

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.