Worthington Primary - Merom Primary 345 kV line (J2585)

Worthington Primary - Merom Primary 345 kV line is a 240.0 MW battery interconnection project in Greene, Indiana with a current status of withdrawn. It is proposed to connect at Worthington Primary - Merom Primary 345 kV line.

240.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameWorthington Primary - Merom Primary 345 kV line
Queue IDJ2585
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity240.0 MW
StateIndiana
CountyGreene
Point of interconnectionWorthington Primary - Merom Primary 345 kV line
Requested (queue) date2022-09-15
Proposed in-service date2025-04-01
Operational date2025-04-01
Withdrawn date2023-03-24
Developer
Utility / transmission ownerHoosier Energy

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata