Wosley Substation 69kV (ASGI-2017-013)

Wosley Substation 69kV is a 40.0 MW wind interconnection project in Beadle County, South Dakota with a current status of withdrawn. It is proposed to connect at Wosley Substation 69kV.

40.0 MWCapacity
WithdrawnStatus
SDMarket
WindTechnology

Project facts

Canonical nameWosley Substation 69kV
Queue IDASGI-2017-013
Statuswithdrawn
Source statusWITHDRAWN
MarketSD
TechnologyWind
Capacity40.0 MW
StateSouth Dakota
CountyBeadle County
Point of interconnectionWosley Substation 69kV
Requested (queue) date2018-02-13
Proposed in-service date
Operational date
Withdrawn date2025-05-27
Developer
Utility / transmission ownerEREPC

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.