WSP 3 (835)

WSP 3 is a 800.0 MW solar interconnection project in Kings, California with a current status of withdrawn. It is proposed to connect at Gates Sub 500 KV Bus.

800.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameWSP 3
Queue ID835
Statuswithdrawn
Source statusWITHDRAWN
Market—
TechnologySolar
Capacity800.0 MW
StateCalifornia
CountyKings
Point of interconnectionGates Sub 500 KV Bus
Requested (queue) date2011-03-31
Proposed in-service date—
Operational date—
Withdrawn date2012-03-07
Developer—
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata