Wurno-Claytor 138kV (AC1-226)

Wurno-Claytor 138kV is a 200.1 MW wind interconnection project in Pulaski, Virginia with a current status of withdrawn.

200.1 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameWurno-Claytor 138kV
Queue IDAC1-226
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity200.1 MW
StateVirginia
CountyPulaski
Point of interconnection
Requested (queue) date2016-10-31
Proposed in-service date2019-12-31
Operational date
Withdrawn date2017-04-03
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata