Wurno-Claytor Lake 138 KV (AD1-102)

Wurno-Claytor Lake 138 KV is a 180.0 MW wind interconnection project in Pulaski, Virginia with a current status of withdrawn.

180.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameWurno-Claytor Lake 138 KV
Queue IDAD1-102
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity180.0 MW
StateVirginia
CountyPulaski
Point of interconnection
Requested (queue) date2017-09-21
Proposed in-service date2020-12-18
Operational date
Withdrawn date2023-05-17
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata