Wurno-Claytor Lake 138 KV (AD1-102)
Wurno-Claytor Lake 138 KV is a 180.0 MW wind interconnection project in Pulaski, Virginia with a current status of withdrawn.
180.0 MWCapacity
WithdrawnStatus
—Market
WindTechnology
Project facts
| Canonical name | Wurno-Claytor Lake 138 KV |
|---|---|
| Queue ID | AD1-102 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | — |
| Technology | Wind |
| Capacity | 180.0 MW |
| State | Virginia |
| County | Pulaski |
| Point of interconnection | — |
| Requested (queue) date | 2017-09-21 |
| Proposed in-service date | 2020-12-18 |
| Operational date | — |
| Withdrawn date | 2023-05-17 |
| Developer | — |
| Utility / transmission owner | AEP |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata