Wynne South - Wynne East AECC 161 kV Line Tap is a 135.0 MW solar interconnection project in Cross County, Arkansas with a current status of operational. It is proposed to connect at Wynne South - Wynne East AECC 161 kV Line Tap.

135.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameWynne South - Wynne East AECC 161 kV Line Tap
Queue IDJ1125
Statusoperational
Source statusDone
Market
TechnologySolar
Capacity135.0 MW
StateArkansas
CountyCross County
Point of interconnectionWynne South - Wynne East AECC 161 kV Line Tap
Requested (queue) date2018-03-12
Proposed in-service date2021-07-31
Operational date2021-07-31
Withdrawn date
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata