Wyre Wynd Hydroelectric Project (69673_GEN1)

Wyre Wynd Hydroelectric Project is a 2.7 MW other interconnection project in New London, Connecticut with a current status of operational.

2.7 MWCapacity
OperationalStatus
ISNEMarket
OtherTechnology

Project facts

Canonical nameWyre Wynd Hydroelectric Project
Queue ID69673_GEN1
Statusoperational
Source status(OP) Operating
MarketISNE
TechnologyOther
Capacity2.7 MW
StateConnecticut
CountyNew London
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date1984-05-01
Withdrawn date—
Developer—
Utility / transmission ownerRelevate Power Management LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata