Xcel Tuco 345kV Substation (ERAS-2025-002)

Xcel Tuco 345kV Substation is a 217.0 MW gas interconnection project in Abernathy, Texas with a current status of operational. It is proposed to connect at Xcel Tuco 345kV Substation.

217.0 MWCapacity
OperationalStatus
TXMarket
GasTechnology

Project facts

Canonical nameXcel Tuco 345kV Substation
Queue IDERAS-2025-002
Statusoperational
Source statusERAS
MarketTX
TechnologyGas
Capacity217.0 MW
StateTexas
CountyAbernathy
Point of interconnectionXcel Tuco 345kV Substation
Requested (queue) date2025-09-12
Proposed in-service date
Operational date2026-07-31
Withdrawn date
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.