Yellow Jacket Wind (20INR0008)

Yellow Jacket Wind is a 200.1 MW wind interconnection project with a current status of withdrawn. It is proposed to connect at tap 345kV 7046 Kendal - 60618 Edison.

200.1 MWCapacity
WithdrawnStatus
ERCOTMarket
WindTechnology

Project facts

Canonical nameYellow Jacket Wind
Queue ID20INR0008
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyWind
Capacity200.1 MW
State
County
Point of interconnectiontap 345kV 7046 Kendal - 60618 Edison
Requested (queue) date2016-12-29
Proposed in-service date2019-12-19
Operational date
Withdrawn date
DeveloperRES Americas
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.