Yellow Leaf Solar (27INR0455)

Yellow Leaf Solar is a 103.2 MW solar interconnection project in Kaufman, Texas with a current status of operational. It is proposed to connect at Tap 138kV Crandall (#2727) – Kaufman Northwest (#2724) .

103.2 MWCapacity
OperationalStatus
KaufmanMarket
SolarTechnology

Project facts

Canonical nameYellow Leaf Solar
Queue ID27INR0455
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketKaufman
TechnologySolar
Capacity103.2 MW
StateTexas
CountyKaufman
Point of interconnectionTap 138kV Crandall (#2727) – Kaufman Northwest (#2724)
Requested (queue) date2025-04-25
Proposed in-service date
Operational date2028-09-25
Withdrawn date
DeveloperLightsource Renewable Energy Development LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata