Yellow Viking Solar (21INR0520)

Yellow Viking Solar is a 171.1 MW solar interconnection project in Somervell, Texas with a current status of operational. It is proposed to connect at Tap 345kV 1900 Comanche Peak - 11886 Timberview Switch.

171.1 MWCapacity
OperationalStatus
SomervellMarket
SolarTechnology

Project facts

Canonical nameYellow Viking Solar
Queue ID21INR0520
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketSomervell
TechnologySolar
Capacity171.1 MW
StateTexas
CountySomervell
Point of interconnectionTap 345kV 1900 Comanche Peak - 11886 Timberview Switch
Requested (queue) date2020-10-23
Proposed in-service date
Operational date2027-07-13
Withdrawn date
DeveloperYellow Viking Development One, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.