Yoakum 345kV Substation (GEN-2019-011)

Yoakum 345kV Substation is a 207.0 MW battery interconnection project in Yoakum, Texas with a current status of active. It is proposed to connect at Yoakum 345kV Substation.

207.0 MWCapacity
ActiveStatus
TXMarket
BatteryTechnology

Project facts

Canonical nameYoakum 345kV Substation
Queue IDGEN-2019-011
Statusactive
Source statusIA FULLY EXECUTED/ON SCHEDULE
MarketTX
TechnologyBattery
Capacity207.0 MW
StateTexas
CountyYoakum
Point of interconnectionYoakum 345kV Substation
Requested (queue) date2019-04-22
Proposed in-service date2028-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.