Zenobe Wellsville LLC (C24-239)

Zenobe Wellsville LLC is a 100.0 MW battery interconnection project in Allegany, New York with a current status of withdrawn. It is proposed to connect at Homer Hill - Andover 115 kV Line 157.

100.0 MWCapacity
WithdrawnStatus
NYISOMarket
BatteryTechnology

Project facts

Canonical nameZenobe Wellsville LLC
Queue IDC24-239
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologyBattery
Capacity100.0 MW
StateNew York
CountyAllegany
Point of interconnectionHomer Hill - Andover 115 kV Line 157
Requested (queue) date2024-09-23
Proposed in-service date
Operational date
Withdrawn date
DeveloperZenobe Americas Inc.
Utility / transmission ownerNM-NG

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata