ZEUS BESS (1920)

ZEUS BESS is a 200.0 MW battery interconnection project in San Joaquin, California with a current status of active. It is proposed to connect at Schulte 115 kV.

200.0 MWCapacity
ActiveStatus
Market
BatteryTechnology

Project facts

Canonical nameZEUS BESS
Queue ID1920
Statusactive
Source statusACTIVE
Market
TechnologyBattery
Capacity200.0 MW
StateCalifornia
CountySan Joaquin
Point of interconnectionSchulte 115 kV
Requested (queue) date2021-04-15
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata