Clark County, Arkansas — Interconnection Projects

The interXdata warehouse tracks 9 interconnection projects in Clark, Arkansas, representing 776 MW of requested capacity.

9Total projects
0Active
4Operational
5Withdrawn
776 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar6676 MW
Other140 MW
Solar+Gas130 MW
Battery130 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
ETTA - MCNEIL EHV 500.0kVJ3304Solar350.0 MWwithdrawnClark, Arkansas
GURDON - BEIRNE 115.0kVJ3658Solar150.0 MWwithdrawnClark, Arkansas
MISO Queue Project J688 — Solar in Clark, ArkansasJ688Solar92.0 MWwithdrawnClark, Arkansas
BISMARCK-AECC ALPINE 115 KVJ2636Solar78.5 MWwithdrawnClark, Arkansas
Degray187_1Other40.0 MWoperationalClark, Arkansas
MISO Queue Project J685 — Solar+Gas in Clark, ArkansasJ685Solar+Gas30.0 MWwithdrawnClark, Arkansas
Degray187_2Battery30.0 MWoperationalClark, Arkansas
Veolia (Gum Springs)68727_VNASolar5.0 MWoperationalClark, Arkansas
South Central Electric Cooperative68717_SCAECSolar1.0 MWoperationalClark, Arkansas

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Clark County.

Start tracking with interXdata