The interXdata warehouse tracks 6 interconnection projects in Conway, Arkansas, representing 417 MW of requested capacity.

6Total projects
0Active
4Operational
2Withdrawn
417 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar2285 MW
Battery1100 MW
Other332 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Morrilton East Substation (161kV bus)J1559Solar200.0 MWoperationalConway, Arkansas
Pleasant Hill 500kV SubstationJ2458Battery100.0 MWwithdrawnConway, Arkansas
Pleasant Hill 500kV SubstationJ2511Solar85.0 MWwithdrawnConway, Arkansas
Whillock7135_3Other10.8 MWoperationalConway, Arkansas
Whillock7135_1Other10.8 MWoperationalConway, Arkansas
Whillock7135_2Other10.8 MWoperationalConway, Arkansas

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.