Grant County, Arkansas — Interconnection Projects

The interXdata warehouse tracks 11 interconnection projects in Grant, Arkansas, representing 1,320 MW of requested capacity.

11Total projects
0Active
6Operational
5Withdrawn
1,320 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar81,240 MW
Battery380 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Sheridan 500 kVJ2907Solar400.0 MWoperationalGrant, Arkansas
WHITE BLUFF EHV - WRIGHTSVILLE 115.0kVJ2134Solar200.0 MWwithdrawnGrant, Arkansas
WOODWARD 115 SUB - AECC GRAPEVINE 115.0kVJ2983Solar140.0 MWoperationalGrant, Arkansas
J1577 Sub (337689)J3481Solar100.0 MWoperationalGrant, Arkansas
AECC GRAPEVINE - CARTHAGE (AR) 115.0kVJ3788Solar100.0 MWwithdrawnGrant, Arkansas
Redfield Solar69394_REDF1Solar100.0 MWoperationalGrant, Arkansas
HARDIN WEST SS - SHERIDAN 115.0kVJ1577Solar100.0 MWoperationalGrant, Arkansas
Woodward 115kV - H.S. EHV 115 kVJ2072Solar100.0 MWwithdrawnGrant, Arkansas
Woodward-Grapevine 115kV lineJ2993Battery80.0 MWwithdrawnGrant, Arkansas
Hardin West SS to Sheridan 115 kVJ1607Battery0.0 MWoperationalGrant, Arkansas
MABELVALE EHV to WHITE BLUFF EHV 115kVJ2244Battery0.0 MWwithdrawnGrant, Arkansas

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.