Greene County, Arkansas — Interconnection Projects
The interXdata warehouse tracks 15 interconnection projects in Greene, Arkansas, representing 698 MW of requested capacity.
15Total projects
0Active
10Operational
5Withdrawn
698 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 6 | 614 MW |
| Battery | 1 | 50 MW |
| Gas | 7 | 33 MW |
| Other | 1 | 0 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Gainesville Switching Station | J2298 | Solar | 200.0 MW | operational | Greene, Arkansas |
| SEDGEWICK SS - AECC LIGHT 115.0kV | J4035 | Solar | 113.0 MW | withdrawn | Greene, Arkansas |
| Gainesville Switching Station | J3578 | Solar | 100.0 MW | withdrawn | Greene, Arkansas |
| Marmaduke | J2299 | Solar | 100.0 MW | withdrawn | Greene, Arkansas |
| SEDGEWICK SS - AECC LIGHT 115.0kV | J3675 | Solar | 100.0 MW | withdrawn | Greene, Arkansas |
| Gainesville Switching Station | J2300 | Battery | 50.0 MW | withdrawn | Greene, Arkansas |
| Paragould Reciprocating | 8015_021 | Gas | 6.4 MW | operational | Greene, Arkansas |
| Paragould Reciprocating | 8015_011 | Gas | 6.4 MW | operational | Greene, Arkansas |
| Paragould Reciprocating | 8015_031 | Gas | 6.4 MW | operational | Greene, Arkansas |
| Paragould Turbine | 7283_1 | Gas | 3.4 MW | operational | Greene, Arkansas |
| Paragould Turbine | 7283_2 | Gas | 3.4 MW | operational | Greene, Arkansas |
| Paragould Turbine | 7283_3 | Gas | 3.4 MW | operational | Greene, Arkansas |
| Paragould Turbine | 7283_4 | Gas | 3.4 MW | operational | Greene, Arkansas |
| Paragould Solar Farm | 67188_1 | Solar | 1.5 MW | operational | Greene, Arkansas |
| Paragould Turbine | 7283_5 | Other | 0.3 MW | operational | Greene, Arkansas |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Greene County.
Start tracking with interXdata