Trinity County, California — Interconnection Projects

The interXdata warehouse tracks 10 interconnection projects in Trinity, California, representing 153 MW of requested capacity.

10Total projects
0Active
10Operational
0Withdrawn
153 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Other7153 MW
Solar30 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Trinity451_2Other70.0 MWoperationalTrinity, California
Trinity451_1Other70.0 MWoperationalTrinity, California
Big Creek Water Works10282_BCHYOther5.0 MWoperationalTrinity, California
Kekawaka Power House54654_KEK1Other4.9 MWoperationalTrinity, California
Three Forks Water Power Project54308_1Other1.3 MWoperationalTrinity, California
Gosselin Hydro Plant10128_GEN2Other1.0 MWoperationalTrinity, California
Gosselin Hydro Plant10128_GEN1Other1.0 MWoperationalTrinity, California
PG&E DG PGE-INT-113273331PGE-INT-113273331Solar0.0 MWoperationalTrinity, California
PG&E DG PGE-INT-113301423PGE-INT-113301423Solar0.0 MWoperationalTrinity, California
PG&E DG PGE-INT-113306217PGE-INT-113306217Solar0.0 MWoperationalTrinity, California

Top developers

Developer (canonical)ProjectsCapacity
Patterson & Patterson10 MW
Solar City10 MW

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: ca-dgstats; U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.