Douglas County, Colorado — Interconnection Projects
The interXdata warehouse tracks 4 interconnection projects in Douglas, Colorado, representing 12 MW of requested capacity.
4Total projects
2Active
2Operational
0Withdrawn
12 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 2 | 8 MW |
| Other | 2 | 4 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Waterton Solar II | 69620_WTS2 | Solar | 4.0 MW | active | Douglas, Colorado |
| Waterton Solar I | 69293_WTS1 | Solar | 4.0 MW | active | Douglas, Colorado |
| Foothills Hydro Plant | 10070_GEN1 | Other | 3.1 MW | operational | Douglas, Colorado |
| Strontia Springs Hydro Plant | 10081_GEN1 | Other | 1.0 MW | operational | Douglas, Colorado |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.