Douglas County, Colorado — Interconnection Projects

The interXdata warehouse tracks 4 interconnection projects in Douglas, Colorado, representing 12 MW of requested capacity.

4Total projects
2Active
2Operational
0Withdrawn
12 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar28 MW
Other24 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Waterton Solar II69620_WTS2Solar4.0 MWactiveDouglas, Colorado
Waterton Solar I69293_WTS1Solar4.0 MWactiveDouglas, Colorado
Foothills Hydro Plant10070_GEN1Other3.1 MWoperationalDouglas, Colorado
Strontia Springs Hydro Plant10081_GEN1Other1.0 MWoperationalDouglas, Colorado

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Douglas County.

Start tracking with interXdata