Eagle County, Colorado — Interconnection Projects
The interXdata warehouse tracks 6 interconnection projects in Eagle, Colorado, representing 95 MW of requested capacity.
6Total projects
0Active
5Operational
1Withdrawn
95 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 1 | 80 MW |
| Other | 3 | 8 MW |
| Gas | 2 | 6 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| West Queue Project GI-2004-8 — Wind in Eagle, Colorado | GI-2004-8 | Wind | 80.0 MW | withdrawn | Eagle, Colorado |
| Basalt | 7458_1 | Other | 5.0 MW | operational | Eagle, Colorado |
| American Gypsum Cogeneration | 54630_T-2 | Gas | 3.6 MW | operational | Eagle, Colorado |
| American Gypsum Cogeneration | 54630_T-1 | Gas | 2.8 MW | operational | Eagle, Colorado |
| American Gypsum Cogeneration | 54630_D-1 | Other | 1.6 MW | operational | Eagle, Colorado |
| American Gypsum Cogeneration | 54630_D-2 | Other | 1.6 MW | operational | Eagle, Colorado |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Eagle County.
Start tracking with interXdata