Seminole County, Florida — Interconnection Projects

The interXdata warehouse tracks 4 interconnection projects in Seminole, Florida, representing 6 MW of requested capacity.

4Total projects
0Active
4Operational
0Withdrawn
6 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Gas35 MW
Solar12 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Seminole Energy61780_ENG1Gas1.6 MWoperationalSeminole, Florida
Seminole Energy61780_ENG2Gas1.6 MWoperationalSeminole, Florida
Seminole Energy61780_ENG3Gas1.6 MWoperationalSeminole, Florida
Altamonte Mall63254_ALTSolar1.5 MWoperationalSeminole, Florida

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Seminole County.

Start tracking with interXdata