Seminole County, Florida — Interconnection Projects
The interXdata warehouse tracks 4 interconnection projects in Seminole, Florida, representing 6 MW of requested capacity.
4Total projects
0Active
4Operational
0Withdrawn
6 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Gas | 3 | 5 MW |
| Solar | 1 | 2 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Seminole Energy | 61780_ENG1 | Gas | 1.6 MW | operational | Seminole, Florida |
| Seminole Energy | 61780_ENG2 | Gas | 1.6 MW | operational | Seminole, Florida |
| Seminole Energy | 61780_ENG3 | Gas | 1.6 MW | operational | Seminole, Florida |
| Altamonte Mall | 63254_ALT | Solar | 1.5 MW | operational | Seminole, Florida |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Seminole County.
Start tracking with interXdata