Barrow County, Georgia — Interconnection Projects
The interXdata warehouse tracks 4 interconnection projects in Barrow, Georgia, representing 9 MW of requested capacity.
4Total projects
0Active
4Operational
0Withdrawn
9 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Gas | 3 | 7 MW |
| Solar | 1 | 2 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Georgia LFG Oak Grove Plant | 61385_GM01 | Gas | 2.2 MW | operational | Barrow, Georgia |
| Georgia LFG Oak Grove Plant | 61385_GM03 | Gas | 2.2 MW | operational | Barrow, Georgia |
| Georgia LFG Oak Grove Plant | 61385_GM02 | Gas | 2.2 MW | operational | Barrow, Georgia |
| Cedar Creek Solar, LLC | 66200_CEDAR | Solar | 2.0 MW | operational | Barrow, Georgia |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Barrow County.
Start tracking with interXdata