Bibb County, Georgia — Interconnection Projects

The interXdata warehouse tracks 10 interconnection projects in Bibb, Georgia, representing 328 MW of requested capacity.

10Total projects
0Active
10Operational
0Withdrawn
328 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar2130 MW
Battery1128 MW
Other770 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Robins Air Force Base Solar61648_1Solar128.0 MWoperationalBibb, Georgia
Robins Air Force Base Solar61648_2Battery128.0 MWoperationalBibb, Georgia
Graphic Packaging Intl Macon Mill54464_0005Other40.0 MWoperationalBibb, Georgia
Graphic Packaging Intl Macon Mill54464_0004Other15.9 MWoperationalBibb, Georgia
Graphic Packaging Intl Macon Mill54464_0001Other12.8 MWoperationalBibb, Georgia
Bibb Williams67048_SP324Solar2.3 MWoperationalBibb, Georgia
YKK USA Chestney54566_SLD1Other0.5 MWoperationalBibb, Georgia
YKK USA Chestney54566_BWP1Other0.5 MWoperationalBibb, Georgia
YKK USA Chestney54566_SEV1Other0.3 MWoperationalBibb, Georgia
YKK USA Chestney54566_SEV2Other0.2 MWoperationalBibb, Georgia

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Bibb County.

Start tracking with interXdata