Dougherty County County, Georgia — Interconnection Projects

The interXdata warehouse tracks 7 interconnection projects in Dougherty County, Georgia, representing 651 MW of requested capacity.

7Total projects
3Active
3Operational
1Withdrawn
651 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Battery3345 MW
Solar3262 MW
Other144 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Wetherbee Solar FacilityIC-472Solar200.0 MWoperationalDougherty County, Georgia
Georgia Power 26-IC-146726-IC-1467Battery150.0 MWactiveDougherty County, Georgia
Dougherty County BESSGI-211Battery120.0 MWactiveDougherty County, Georgia
Georgia Power 26-IC-146626-IC-1466Battery75.0 MWactiveDougherty County, Georgia
Georgia Power IC-312IC-312Other44.0 MWoperationalDougherty County, Georgia
Georgia Power IC-406IC-406Solar31.0 MWoperationalDougherty County, Georgia
Georgia Power IC-405IC-405Solar31.0 MWwithdrawnDougherty County, Georgia

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: gtc-oasis; soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Dougherty County County.

Start tracking with interXdata