Polk County County, Georgia — Interconnection Projects
The interXdata warehouse tracks 5 interconnection projects in Polk County, Georgia, representing 900 MW of requested capacity.
5Total projects
1Active
3Operational
1Withdrawn
900 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Battery | 4 | 700 MW |
| Solar | 1 | 200 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Georgia Power 25-IC-1346 | 25-IC-1346 | Battery | 225.0 MW | withdrawn | Polk County, Georgia |
| Georgia Power 26-IC-1448 | 26-IC-1448 | Battery | 225.0 MW | active | Polk County, Georgia |
| Cedartown Solar | IC-869 | Solar | 200.0 MW | operational | Polk County, Georgia |
| Aragon Energy Storage | IC-952 | Battery | 150.0 MW | operational | Polk County, Georgia |
| PC Energy LLC | 26-IC-1488 | Battery | 100.0 MW | operational | Polk County, Georgia |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Polk County County.
Start tracking with interXdata