Seminole County, Georgia — Interconnection Projects
The interXdata warehouse tracks 7 interconnection projects in Seminole, Georgia, representing 552 MW of requested capacity.
7Total projects
0Active
1Operational
6Withdrawn
552 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 5 | 362 MW |
| Solar+Battery | 2 | 190 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Southeast Queue Project IC-677 — Solar in Seminole, Georgia | IC-677 | Solar | 150.0 MW | withdrawn | Seminole, Georgia |
| Southeast Queue Project 25-IC-AZ — Solar+Battery in Seminole, Georgia | 25-IC-AZ | Solar+Battery | 100.0 MW | withdrawn | Seminole, Georgia |
| Southeast Queue Project IC-1027 — Solar+Battery in Seminole, Georgia | IC-1027 | Solar+Battery | 90.0 MW | withdrawn | Seminole, Georgia |
| Southeast Queue Project IC-1115 — Solar in Seminole, Georgia | IC-1115 | Solar | 80.0 MW | withdrawn | Seminole, Georgia |
| Southeast Queue Project IC-607 — Solar in Seminole, Georgia | IC-607 | Solar | 80.0 MW | withdrawn | Seminole, Georgia |
| Southeast Queue Project IC-328 — Solar in Seminole, Georgia | IC-328 | Solar | 50.0 MW | withdrawn | Seminole, Georgia |
| Seminole (GA) | 60514_PV1 | Solar | 1.6 MW | operational | Seminole, Georgia |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-05
Page data generated2026-08-05
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Seminole County.
Start tracking with interXdata