Seminole County, Georgia — Interconnection Projects

The interXdata warehouse tracks 7 interconnection projects in Seminole, Georgia, representing 552 MW of requested capacity.

7Total projects
0Active
1Operational
6Withdrawn
552 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar5362 MW
Solar+Battery2190 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Southeast Queue Project IC-677 — Solar in Seminole, GeorgiaIC-677Solar150.0 MWwithdrawnSeminole, Georgia
Southeast Queue Project 25-IC-AZ — Solar+Battery in Seminole, Georgia25-IC-AZSolar+Battery100.0 MWwithdrawnSeminole, Georgia
Southeast Queue Project IC-1027 — Solar+Battery in Seminole, GeorgiaIC-1027Solar+Battery90.0 MWwithdrawnSeminole, Georgia
Southeast Queue Project IC-1115 — Solar in Seminole, GeorgiaIC-1115Solar80.0 MWwithdrawnSeminole, Georgia
Southeast Queue Project IC-607 — Solar in Seminole, GeorgiaIC-607Solar80.0 MWwithdrawnSeminole, Georgia
Southeast Queue Project IC-328 — Solar in Seminole, GeorgiaIC-328Solar50.0 MWwithdrawnSeminole, Georgia
Seminole (GA)60514_PV1Solar1.6 MWoperationalSeminole, Georgia

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-05
Page data generated2026-08-05

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Seminole County.

Start tracking with interXdata