Sumter County, Georgia — Interconnection Projects

The interXdata warehouse tracks 15 interconnection projects in Sumter, Georgia, representing 2,280 MW of requested capacity.

15Total projects
5Active
2Operational
8Withdrawn
2,280 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar121,808 MW
Solar+Battery3472 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Southeast Queue Project IC-652 — Solar in Sumter, GeorgiaIC-652Solar615.0 MWactiveSumter, Georgia
Southeast Queue Project IC-695 — Solar in Sumter, GeorgiaIC-695Solar250.0 MWactiveSumter, Georgia
Southeast Queue Project IC-696 — Solar in Sumter, GeorgiaIC-696Solar250.0 MWactiveSumter, Georgia
Southeast Queue Project IC-839 — Solar+Battery in Sumter, GeorgiaIC-839Solar+Battery200.0 MWactiveSumter, Georgia
Southeast Queue Project IC-978 — Solar+Battery in Sumter, GeorgiaIC-978Solar+Battery180.0 MWwithdrawnSumter, Georgia
Southeast Queue Project IC-447 — Solar in Sumter, GeorgiaIC-447Solar152.0 MWwithdrawnSumter, Georgia
Southeast Queue Project IC-445 — Solar in Sumter, GeorgiaIC-445Solar152.0 MWwithdrawnSumter, Georgia
Southeast Queue Project IC-446 — Solar in Sumter, GeorgiaIC-446Solar152.0 MWwithdrawnSumter, Georgia
Southeast Queue Project IC-368 — Solar in Sumter, GeorgiaIC-368Solar100.0 MWwithdrawnSumter, Georgia
Southeast Queue Project 25-IC-1387 — Solar+Battery in Sumter, Georgia25-IC-1387Solar+Battery92.0 MWactiveSumter, Georgia
Southeast Queue Project IC-466 — Solar in Sumter, GeorgiaIC-466Solar60.0 MWwithdrawnSumter, Georgia
Southeast Queue Project IC-597 — Solar in Sumter, GeorgiaIC-597Solar60.0 MWwithdrawnSumter, Georgia
Southeast Queue Project IC-316 — Solar in Sumter, GeorgiaIC-316Solar14.0 MWwithdrawnSumter, Georgia
Brady Solar LLC65729_GABRSolar1.8 MWoperationalSumter, Georgia
Freeman Avenue62887_FREAVSolar1.4 MWoperationalSumter, Georgia

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-05
Page data generated2026-08-05

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Sumter County.