Taylor County, Georgia — Interconnection Projects
The interXdata warehouse tracks 13 interconnection projects in Taylor, Georgia, representing 414 MW of requested capacity.
13Total projects
0Active
13Operational
0Withdrawn
414 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 5 | 406 MW |
| Gas | 8 | 8 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Taylor County Solar | 59897_1 | Solar | 148.0 MW | operational | Taylor, Georgia |
| Butler Solar Project 103 | 59896_1 | Solar | 104.0 MW | operational | Taylor, Georgia |
| White Pine Solar, LLC | 60064_WHTPN | Solar | 101.2 MW | operational | Taylor, Georgia |
| Pawpaw Solar Plant | 59894_1 | Solar | 30.5 MW | operational | Taylor, Georgia |
| Butler Solar Farm 20 | 59891_1 | Solar | 22.0 MW | operational | Taylor, Georgia |
| Taylor | 56870_3 | Gas | 1.0 MW | operational | Taylor, Georgia |
| Taylor | 56870_8 | Gas | 1.0 MW | operational | Taylor, Georgia |
| Taylor | 56870_1 | Gas | 1.0 MW | operational | Taylor, Georgia |
| Taylor | 56870_2 | Gas | 1.0 MW | operational | Taylor, Georgia |
| Taylor | 56870_6 | Gas | 1.0 MW | operational | Taylor, Georgia |
| Taylor | 56870_7 | Gas | 1.0 MW | operational | Taylor, Georgia |
| Taylor | 56870_5 | Gas | 1.0 MW | operational | Taylor, Georgia |
| Taylor | 56870_4 | Gas | 1.0 MW | operational | Taylor, Georgia |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.