Troup County, Georgia — Interconnection Projects

The interXdata warehouse tracks 5 interconnection projects in Troup, Georgia, representing 77 MW of requested capacity.

5Total projects
0Active
5Operational
0Withdrawn
77 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Other373 MW
Solar24 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
West Point (GA)6133_2Other35.0 MWoperationalTroup, Georgia
West Point (GA)6133_3Other35.0 MWoperationalTroup, Georgia
West Point (GA)6133_1Other3.3 MWoperationalTroup, Georgia
Kimberly-Clark Solar62960_KCSolar2.3 MWoperationalTroup, Georgia
Troup RC50 II64284_TRC50Solar1.5 MWoperationalTroup, Georgia

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Troup County.

Start tracking with interXdata