Douglas County, Illinois — Interconnection Projects
The interXdata warehouse tracks 4 interconnection projects in Douglas, Illinois, representing 604 MW of requested capacity.
4Total projects
0Active
2Operational
2Withdrawn
604 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 4 | 604 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| MISO Queue Project J468 — Wind in Douglas, Illinois | J468 | Wind | 202.0 MW | operational | Douglas, Illinois |
| Harvest Ridge Wind Farm | 61161_GEN01 | Wind | 202.0 MW | operational | Douglas, Illinois |
| MISO Queue Project H006 — Wind in Douglas, Illinois | H006 | Wind | 100.0 MW | withdrawn | Douglas, Illinois |
| MISO Queue Project G978 — Wind in Douglas, Illinois | G978 | Wind | 100.0 MW | withdrawn | Douglas, Illinois |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Douglas County.
Start tracking with interXdata