Edwards County, Illinois — Interconnection Projects
The interXdata warehouse tracks 5 interconnection projects in Edwards, Illinois, representing 726 MW of requested capacity.
5Total projects
2Active
1Operational
2Withdrawn
726 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 3 | 488 MW |
| Solar+Battery | 2 | 238 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Albion-Crossville 138kV Line | J1579 | Solar | 200.0 MW | withdrawn | Edwards, Illinois |
| MISO Queue Project J1579 — Solar in Edwards, Illinois | J1579 | Solar | 200.0 MW | withdrawn | Edwards, Illinois |
| MISO Queue Project J1422 — Solar+Battery in Edwards, Illinois | J1422 | Solar+Battery | 150.0 MW | active | Edwards, Illinois |
| Olney (4JASPER 347868) - Albion (4ALBION N 346510) 138 kV | J3223 | Solar | 88.0 MW | operational | Edwards, Illinois |
| MISO Queue Project J3223 — Solar+Battery in Edwards, Illinois | J3223 | Solar+Battery | 88.0 MW | active | Edwards, Illinois |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-01
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; miso-giqueue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Edwards County.
Start tracking with interXdata