Knox County, Illinois — Interconnection Projects
The interXdata warehouse tracks 17 interconnection projects in Knox, Illinois, representing 1,283 MW of requested capacity.
17Total projects
1Active
11Operational
5Withdrawn
1,283 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 4 | 612 MW |
| Solar | 12 | 571 MW |
| Battery | 1 | 100 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| 7FARGO - 7SANDBURG 345.0kV | J3498 | Solar | 250.0 MW | operational | Knox, Illinois |
| Kawanee 138kV | R29 | Wind | 200.0 MW | withdrawn | Knox, Illinois |
| Other_ | J3323 | Solar | 200.0 MW | withdrawn | Knox, Illinois |
| 4MONM BLVD W - 4CASTRO_JCT 138.0kV | J2938 | Wind | 200.0 MW | operational | Knox, Illinois |
| MISO Queue Project J008 — Wind in Knox, Illinois | J008 | Wind | 150.0 MW | withdrawn | Knox, Illinois |
| 7FARGO - 7SANDBURG 345.0kV | J3344 | Battery | 100.0 MW | operational | Knox, Illinois |
| 4MONM BLVD W - 4CASTRO_JCT 138.0kV | J3343 | Solar | 100.0 MW | withdrawn | Knox, Illinois |
| MISO Queue Project G694 — Wind in Knox, Illinois | G694 | Wind | 62.0 MW | withdrawn | Knox, Illinois |
| SV CSG Reeder Solar | 69158_REEDR | Solar | 5.0 MW | active | Knox, Illinois |
| Galesburg 650 Solar 1, LLC | 70073_GB650 | Solar | 2.0 MW | operational | Knox, Illinois |
| Illinois PV Knox 3B | 68952_PV1 | Solar | 2.0 MW | operational | Knox, Illinois |
| Illinois PV Knox 1B | 67805_PV1 | Solar | 2.0 MW | operational | Knox, Illinois |
| Illinois PV Knox 2A | 69652_PV1 | Solar | 2.0 MW | operational | Knox, Illinois |
| Illinois PV Knox 3A | 68951_PV1 | Solar | 2.0 MW | operational | Knox, Illinois |
| Illinois PV Knox 1A | 67816_PV1 | Solar | 2.0 MW | operational | Knox, Illinois |
| Elba Solar LLC | 65797_ELBA | Solar | 2.0 MW | operational | Knox, Illinois |
| Illinois PV Knox 2B | 69653_PV1 | Solar | 2.0 MW | operational | Knox, Illinois |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; MISO — generator interconnection queue; PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.