Barber County, Kansas — Interconnection Projects
The interXdata warehouse tracks 6 interconnection projects in Barber, Kansas, representing 613 MW of requested capacity.
6Total projects
2Active
3Operational
1Withdrawn
613 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Battery | 2 | 215 MW |
| Wind | 3 | 209 MW |
| Solar | 1 | 189 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Pixley Solar Energy | 68498_PIXLY | Solar | 189.0 MW | operational | Barber, Kansas |
| Thistle 345kV Substation | GEN-2026-SR24 | Battery | 120.0 MW | active | Barber, Kansas |
| Viola 345kV | GEN-2012-023 | Wind | 115.0 MW | withdrawn | Barber, Kansas |
| Thistle 345kV substation | GEN-2018-108 | Battery | 95.0 MW | active | Barber, Kansas |
| Flat Ridge Wind Farm | 56819_1 | Wind | 50.0 MW | operational | Barber, Kansas |
| Flat Ridge Wind Energy LLC | 56879_1 | Wind | 44.0 MW | operational | Barber, Kansas |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.