Barber County, Kansas — Interconnection Projects

The interXdata warehouse tracks 6 interconnection projects in Barber, Kansas, representing 613 MW of requested capacity.

6Total projects
2Active
3Operational
1Withdrawn
613 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Battery2215 MW
Wind3209 MW
Solar1189 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Pixley Solar Energy68498_PIXLYSolar189.0 MWoperationalBarber, Kansas
Thistle 345kV SubstationGEN-2026-SR24Battery120.0 MWactiveBarber, Kansas
Viola 345kVGEN-2012-023Wind115.0 MWwithdrawnBarber, Kansas
Thistle 345kV substationGEN-2018-108Battery95.0 MWactiveBarber, Kansas
Flat Ridge Wind Farm56819_1Wind50.0 MWoperationalBarber, Kansas
Flat Ridge Wind Energy LLC56879_1Wind44.0 MWoperationalBarber, Kansas

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Barber County.

Start tracking with interXdata