Thistle 345kV Substation (GEN-2026-SR24)

Thistle 345kV Substation is a 120.0 MW battery interconnection project in Barber, Kansas with a current status of active. It is proposed to connect at Thistle 345kV Substation.

120.0 MWCapacity
ActiveStatus
KSMarket
BatteryTechnology

Project facts

Canonical nameThistle 345kV Substation
Queue IDGEN-2026-SR24
Statusactive
Source statusSPECIAL STUDY
MarketKS
TechnologyBattery
Capacity120.0 MW
StateKansas
CountyBarber
Point of interconnectionThistle 345kV Substation
Requested (queue) date2026-06-18
Proposed in-service date2028-09-15
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerITCGP

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_project—activehigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata