Linn County, Kansas — Interconnection Projects
The interXdata warehouse tracks 5 interconnection projects in Linn, Kansas, representing 1,779 MW of requested capacity.
5Total projects
0Active
2Operational
3Withdrawn
1,779 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 2 | 1,599 MW |
| Solar | 2 | 140 MW |
| Battery | 1 | 40 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| La Cygne | 1241_1 | Other | 873.0 MW | operational | Linn, Kansas |
| La Cygne | 1241_2 | Other | 725.9 MW | operational | Linn, Kansas |
| KC South - N. Raymore 161kV Line | GEN-2018-054 | Solar | 120.0 MW | withdrawn | Linn, Kansas |
| Archie 161kV substation | GEN-2018-114 | Battery | 40.0 MW | withdrawn | Linn, Kansas |
| Tap Bush City-Centerville 34.5kV | ASGI-2018-008 | Solar | 20.0 MW | withdrawn | Linn, Kansas |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Linn County.
Start tracking with interXdata