Tap Bush City-Centerville 34.5kV (ASGI-2018-008)

Tap Bush City-Centerville 34.5kV is a 20.0 MW solar interconnection project in Linn, Kansas with a current status of withdrawn. It is proposed to connect at Tap Bush City-Centerville 34.5kV.

20.0 MWCapacity
WithdrawnStatus
KSMarket
SolarTechnology

Project facts

Canonical nameTap Bush City-Centerville 34.5kV
Queue IDASGI-2018-008
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologySolar
Capacity20.0 MW
StateKansas
CountyLinn
Point of interconnectionTap Bush City-Centerville 34.5kV
Requested (queue) date2018-07-26
Proposed in-service date
Operational date
Withdrawn date2021-05-07
Developer
Utility / transmission ownerGMO

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.