Seward County, Kansas — Interconnection Projects

The interXdata warehouse tracks 7 interconnection projects in Seward, Kansas, representing 462 MW of requested capacity.

7Total projects
0Active
3Operational
4Withdrawn
462 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar4394 MW
Gas368 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Cimarron River 115 kV SubstationGEN-2024-218Solar199.0 MWwithdrawnSeward, Kansas
Walkemeyer - Cimarron 115kVGEN-2021-087Solar100.0 MWwithdrawnSeward, Kansas
North Liberal 115kV substationGEN-2019-059Solar75.0 MWwithdrawnSeward, Kansas
Cimarron River1230_1Gas50.0 MWoperationalSeward, Kansas
North Liberal 115 kV SubstationGEN-2020-082Solar20.0 MWwithdrawnSeward, Kansas
Cimarron River1230_2Gas15.0 MWoperationalSeward, Kansas
Arkalon Ethanol LLC58192_ST961Gas3.0 MWoperationalSeward, Kansas

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Seward County.

Start tracking with interXdata