Cimarron River is a 15.0 MW gas interconnection project in Seward, Kansas with a current status of operational.

15.0 MWCapacity
OperationalStatus
SWPPMarket
GasTechnology

Project facts

Canonical nameCimarron River
Queue ID1230_2
Statusoperational
Source status(SB) Standby/Backup: available for service but not normally used
MarketSWPP
TechnologyGas
Capacity15.0 MW
StateKansas
CountySeward
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1968-02-01
Withdrawn date
Developer
Utility / transmission ownerSunflower Electric Power Corp

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.