Adair County, Kentucky — Interconnection Projects
The interXdata warehouse tracks 4 interconnection projects in Adair, Kentucky, representing 238 MW of requested capacity.
4Total projects
0Active
0Operational
4Withdrawn
238 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 3 | 178 MW |
| Solar+Battery | 1 | 60 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Summer Shade - West Columbia 69 kV | AI1-079 | Solar | 64.8 MW | withdrawn | Adair, Kentucky |
| PJM Queue Project AG2-179 — Solar+Battery in Adair, Kentucky | AG2-179 | Solar+Battery | 60.0 MW | withdrawn | Adair, Kentucky |
| Sewellton Junction 69 kV | AG2-179 - moved to TC2 | Solar | 60.0 MW | withdrawn | Adair, Kentucky |
| PJM Queue Project AG2-160 — Solar in Adair, Kentucky | AG2-160 | Solar | 53.0 MW | withdrawn | Adair, Kentucky |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| Round Trip, LLC | 1 | 60 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Adair County.
Start tracking with interXdata