Scott County, Kentucky — Interconnection Projects
The interXdata warehouse tracks 4 interconnection projects in Scott, Kentucky, representing 187 MW of requested capacity.
4Total projects
0Active
2Operational
2Withdrawn
187 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 2 | 185 MW |
| Gas | 2 | 2 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Penn-Lees Lick 69 kV | AE1-251 | Solar | 120.0 MW | withdrawn | Scott, Kentucky |
| Renaker-Avon 138 kV | AG2-596 | Solar | 65.0 MW | withdrawn | Scott, Kentucky |
| Green City Recovery, LLC | 60703_1 | Gas | 1.0 MW | operational | Scott, Kentucky |
| Green City Recovery, LLC | 60703_2 | Gas | 1.0 MW | operational | Scott, Kentucky |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Scott County.
Start tracking with interXdata