Red River County, Louisiana — Interconnection Projects
The interXdata warehouse tracks 4 interconnection projects in Red River, Louisiana, representing 441 MW of requested capacity.
4Total projects
0Active
3Operational
1Withdrawn
441 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 2 | 280 MW |
| Battery | 1 | 140 MW |
| Other | 1 | 21 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Layfield - Western Kraft 230.0kV | J2526 | Solar | 200.0 MW | operational | Red River, Louisiana |
| Western Kraft-Layfield 230 kV | J2489 | Battery | 140.0 MW | withdrawn | Red River, Louisiana |
| RINGGOLD - CARROLL (CLECO) 115.0kV | J2819 | Solar | 80.0 MW | operational | Red River, Louisiana |
| Arq Solutions Red River | 57938_GEN1 | Other | 20.8 MW | operational | Red River, Louisiana |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Red River County.
Start tracking with interXdata