Red River County, Louisiana — Interconnection Projects

The interXdata warehouse tracks 4 interconnection projects in Red River, Louisiana, representing 441 MW of requested capacity.

4Total projects
0Active
3Operational
1Withdrawn
441 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar2280 MW
Battery1140 MW
Other121 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Layfield - Western Kraft 230.0kVJ2526Solar200.0 MWoperationalRed River, Louisiana
Western Kraft-Layfield 230 kVJ2489Battery140.0 MWwithdrawnRed River, Louisiana
RINGGOLD - CARROLL (CLECO) 115.0kVJ2819Solar80.0 MWoperationalRed River, Louisiana
Arq Solutions Red River57938_GEN1Other20.8 MWoperationalRed River, Louisiana

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Red River County.